8872 S. Eastern Avenue, Suite 290, Las Vegas, NV 89123 info@ceecinc.com +1.702.772.5292

Project Neon

Construction Management

During the construction phase, we can provide professional management practices consisting of array of services for planning, design, construction, and post construction phases for the purpose of achieving project objectives including the management of quality, cost, time, and scope. We can provide a Construction Manager (CM) who will act as an extension of staff to the Owner and manage the entire project with pre-planning, design, construction, engineering and management expertise that can assure the best possible project outcome no matter what type of project delivery method.

more

City of Henderson Environmental Services

Environmental Compliance

On large environmental construction projects, we can provide Owners staff dedicated to ensure that all required environmental mitigation, as specified in the Final Environmental Impact Statement (FEIS), Record of Decision (ROD), and Contract Specifications are met. We do this by developing an environmental matrix including a checklist and timeframes of all commitments defined in the above documents up to the close-out of all permits. We also have certified Dust Monitors on our staff.

more

Team Building

the staff

A small, hard-working engineering consulting firm based in Henderson, Nevada. Established in 2002, we hit the ground running as part of the historical Hoover Dam Bypass Construction Management Team. Small diverse staff, large scale solutions, communication driven and project managing, we offer our clients the full package.

more

current projects

founded in 2002, ceec inc has a long history of delivering excellence in civil engineering services.
today, ceec inc continues in its journey of delivering with quality and excellence. below are some of our current projects.

Garnet Interchange Design-Build

The Garnet Design-Build Project will provide safety, operational and capacity improvements to the Garnet Interchange (Interstate 15 and US 93 interchange) and US 93 to the north. These highways carry an increasing level of freight traffic to and from Northern Nevada, and provide access to adjacent industrial and manufacturing enterprises, such as the Apex Industrial Park.

Project Neon Design Build Project

Project Neon is a 3.7-mile long widening of Interstate 15 (I-15) between Sahara Avenue south to the I-15/US Route 95/Interstate 515 Interchange and includes work such as high occupancy vehicle system, Charleston Interchange reconstruction, Grand Central Industrial connector and local street connections and ancillary improvements.

I-11 Boulder City Bypass Design Build Project

Design, construction, and installation of an approximate 12.2 mile segment of I-11 that takes a southerly route around urban Boulder City, Clark County, Nevada.

Environmental Services-Pittman North Detention Basin and Outfall Phase III

Provide desert tortoise monitoring during the transport of stockpile material in the Pittman North Detention Basin into abandoned pits and future Clark County School site.